Fig. 3: Ongoing restoration, looking east along the C111 canal in the Southern Everglades. Levees yet to be removed are in the foreground, and levees have been removed in the background to allow greater freshwater inputs into the marshes to the right.

Fig. 3: Ongoing restoration, looking east along the C111 canal

Fig. 3: Ongoing restoration, looking east along the C111 canal in the Southern Everglades. Levees yet to be removed are in the foreground, and levees have been removed in the background to allow greater freshwater inputs into the marshes to the right.

From: 
An Introduction to the New Land Margin LTER Site: Florida Coastal Everglades (FCE LTER)